Last Updated: November 16, 2026
Data note: Utah County street lists use Utah County permit records through Nov 3, 2026. The county removed its permit feed, so there is no newer Utah County data.
Quick Summary
Utah County new construction leads come from public building permit records, which show where homes are being built and at what stage. Pull permit data by city, estimate move-in timing from each stage, and plan trade outreach around the streets nearing move-in.
- Every new home needs a permit before framing starts, and those filings are public.
- Check the permit office for each city you serve, since every jurisdiction keeps its own records.
- Treat move-in dates from permit stages as estimates and recheck streets weekly.
- Sort streets by stage so you can see which homes fit your trade's window.
- Plan outreach around move-in rather than trying to pin an exact day.
Table of Contents
- Why Utah County New Construction Leads Start With Public Permits
- Utah County Building Permits: Where to Look and What They Tell You
- Estimating New Home Move-In Timing From Permit Stages
- Building a Weekly New Construction Lead List Workflow
- Contractor Outreach Scripts for New Homeowners
- Matching Trades to Move-In Stages Across Utah County
- Start Planning Utah County Outreach Around Move-In
- Frequently Asked Questions
Why Utah County New Construction Leads Start With Public Permits
Utah County new construction leads begin with public building permit records. Every new home needs a permit before framing starts, and that filing is public. New Home Watch uses those records to build weekly street lists of homes nearing move-in, with timing estimated from permit stages.
Many contractors find leads by driving neighborhoods, buying purchased lists, or cold-calling homeowners who may not be close to closing. Permit data lets you start with the street and work toward the move-in window instead.
A permit tells you a house exists, not when the family arrives. Treat every date as an estimate. The useful question is which streets are entering the stage where your trade fits, and that is what a weekly list helps you see.
Utah County Building Permits: Where to Look and What They Tell You
Building permits are filed with the local jurisdiction where the home is being built. Each city and unincorporated area handles its own records, so check the permit office for every city you serve. Look for the parcel address, the permit type, the issue date, and the project status.
Permit types tell you a lot. A new single-family permit means a home is starting. A later inspection or certificate of occupancy suggests the home is close to move-in. Permit data alone won't give exact dates, so pair these records with stage-based estimates.
If you want a faster route, the Utah County market page shows estimated homes nearing move-in from Utah County permit records through Nov 3, 2026. Those numbers are estimates drawn from permit activity, not confirmed sales.
Estimating New Home Move-In Timing From Permit Stages
Move-in timing follows a rough sequence: permit issued, foundation, framing, rough-in inspections, final inspection, certificate of occupancy, then move-in. The gap between stages varies by builder, season, and lot.
Use the stage as your planning anchor. A home at framing is months away from most finish-out trades. A home near final inspection is weeks away. Plan your route around those windows rather than trying to pin a single day.
A common mistake is treating an estimate as a schedule. Builders shift timelines constantly. Build a buffer into your calendar and recheck streets each week before you commit a crew.
Building a Weekly New Construction Lead List Workflow
Start with a fixed day each week to pull your list. Sort streets by stage so you can see what is entering your trade's window. Mark which streets you have already contacted and when you plan to return.

Keep the workflow simple:
- Pull the weekly street list for your county
- Filter by the stages that match your trade
- Plan one route per day to keep drive time low
- Log every visit or outreach attempt with a date
- Recheck the list the following week and drop streets that moved past your window
Many small shops find that a standing weekly routine beats sporadic prospecting. The consistency matters more than the volume on any single week.
Contractor Outreach Scripts for New Homeowners
The harder problem is qualifying a street before you spend a drive on it, then following up without pestering anyone. New Home Watch gives you public-permit streets and estimated move-in timing only, so your outreach has to work without homeowner phone numbers or confirmed installation dates. Build the script around that reality.
Qualify the street before the door. Before you route a day, check three things on your list: the stage the home is entering, whether the builder is still active on the lot, and whether your trade fits that stage. A home at framing is not a blinds conversation yet. A home near final inspection is. Sorting first keeps you from knocking on doors that are months out.
Identify the right decision-maker. On a new build the buyer, the builder's superintendent, and the site realtor can all be the right contact depending on your trade. Ask one clear question at the door or on the phone: who handles selections or finish-out for this home? Write the answer down. That name is worth more than a stack of flyers.
Use a short, honest opening. Keep it to an introduction, your trade, and one question:
"Hi, I'm [name] with [company]. We handle [trade] for newly built homes on this street. Who should I talk to about upcoming needs for the home?"
If no one answers, leave a card and note the address and date. Do not assume a move-in date or a phone number you do not have.
Run a follow-up cadence, not a one-time visit. One approach is to plan several touches across the window: one when the street enters your stage, a follow-up a week or two later, and one as the home nears completion. Log each touch with a date so you are not repeating yourself. Watch out: treating an estimated move-in as a confirmed date will have you showing up after the family has already chosen a competitor.
Track everything in one place. A simple spreadsheet with street, stage, contact name, last touch, and next step beats memory. If you use a CRM, mirror the same fields. The point is to recheck the list weekly and drop streets that have moved past your window, so your route stays current.
See how a real street list is formatted with the Orem sample street list, then plan outreach around move-in rather than guessing at dates.
Matching Trades to Move-In Stages Across Utah County
A permit stage is only useful if you can map it to your trade. The sequence is roughly the same on most Utah County lots: permit issued, foundation, framing, rough-in inspections, insulation and drywall, final inspection, certificate of occupancy, then move-in. What changes is the gap between stages, and that gap is where your planning lives.
Early stages (permit through framing). This is planning and bid territory. Trades that need to get in before drywall may want to be talking to the builder or superintendent here, since this is the window to get on the builder's radar.
Mid stages (rough-in through drywall). Timing for some trades such as water softeners and filtration can vary by builder. This is when a measured conversation about finish-out timing makes sense.
Late stages (final inspection through certificate of occupancy). Plan outreach for these trades around move-in rather than trying to pin an exact day. Plan outreach around move-in for these trades rather than trying to pin an exact day.
Adjust for builder pace. A production builder and a custom builder move at different speeds, and season shifts timelines too. Timelines can differ between custom and production builders, so a street that looks close on paper may still be weeks out. Recheck the list each week before you commit a crew.
Read the same list differently by trade. Different shops can filter the list to the stages that fit their trade. The list is a planning tool, not a schedule.
If you want to see how a specific city looks before signing up, the Orem sample street list shows the format, and the Utah County market page shows estimated homes nearing move-in from Utah County permit records through Nov 3, 2026. Those figures are estimates from permit activity, not confirmed sales or install dates.
The sequence is roughly the same on most Utah County lots, so the stage you are in tells you which trades to plan for.
| Stage | Planning focus | Trade timing note |
|---|---|---|
| Permit through framing | Bid territory and builder contact | Get on the builder's radar early |
| Rough-in through drywall | Measured talk about finish-out timing | Timing varies by builder for some trades |
| Final inspection through certificate of occupancy | Plan outreach around move-in | Avoid pinning an exact day |
Start Planning Utah County Outreach Around Move-In
Utah County new construction leads come from a steady routine: pull public permit data, match streets to your trade's stage, visit on a planned route, and recheck weekly. New Home Watch provides the public-permit street lists and estimated timing that make that routine practical. It does not provide homeowner contacts or confirmed installation dates.
The free weekly street list is emailed with no card required. Utah County data runs through Nov 3, 2026, because the county removed its permit feed.
Get the free weekly street list to see Utah County streets nearing move-in, or review the Utah County market page first.
Frequently Asked Questions
How can contractors find new construction leads in Utah County?
Start with public building permit records, which list new residential construction projects by address and permit date. Filter for permits that have passed framing or are near final inspection, since those homes tend to be closer to move-in. Many contractors then organize addresses into street-by-street lists so they can plan outreach by neighborhood rather than chasing single addresses. New Home Watch provides weekly street lists of Utah County new homes nearing move-in, estimated from these public permits, which can save time compared with building the list by hand.
Can public permit records confirm a home's move-in or installation date?
No. Public permit records show that work was permitted and how far inspections have progressed, but they do not confirm when a homeowner will move in or when any finish-out installation will happen. Move-in timing is an estimate based on permit stage and typical build timelines. Treat it as a planning signal, and confirm timing directly with the builder or homeowner before scheduling a crew.
How can contractors plan outreach without homeowner contact information?
Plan outreach around the street and the move-in window rather than individual phone numbers. Once you know which streets have homes nearing move-in, you can time route visits, mailers, or local marketing to those neighborhoods. Public permit data does not include homeowner contact details, so focus on building a schedule and a consistent follow-up process for the builders and streets you target.
How often should contractors review new construction leads?
A weekly review works well for most home-services trades. Permit activity and inspection stages change over several weeks, so a weekly check catches homes as they move closer to move-in without overwhelming your schedule. Save each week's list so you can compare how a street changed from one review to the next.
